Broadband Briefing Documents:
DOWNLOAD
- MSIL resilience commercial proposition
- Briefing C21-BB-029, on an MSIL Resilience – commercial proposition and demand survey for consideration by CPs. Zip file with pdf file and word extract for the responses
(94 KB)- 08/08/2008
- WBMC roadmap development
- Zip file with briefing C21-BB-028 as a pdf and with separate response form in word, to aid BTW’s prioritisation & roadmap development for Wholesale Managed Broadband Connect (WBMC)
(129 KB)- 13/06/2008
- Closure document C21-BB-026
- C21-BB-026. BT's Product Proposal using the Proposed Openreach GEA Product (specifically FTTP) as access technology to Wholesale Broadband Connect (WBC): Consultation Closure & BT Response.
(179 KB)- 10/03/2008
- Closure document C21-BB-025
- C21-BB-025. Dedicated Downstream QoS (DDQ) on Wholesale Broadband Connect (WBC): Consultation Closure & BT Response
(175 KB)- 10/03/2008
- High Speed Broadband
- Briefing C21-MG-020 that outlines BT’s proposals to pause work on the Broadband First migration for a period of four weeks to allow BT to engage with industry on ways it might accelerate next generation broadband trials.
(28 KB)- 31/08/2007
- IPstream Connect - closure
- C21-BB-021, closure document for the consultation on IPstream Connect (formally known as BRAS Interconnect)
(122 KB)- 16/04/2007
- wBBC interim closure
- Zip file containing briefing C21-BB-012 the interim closure report for the wBBC consultation
(484 KB)- 08/12/2006
- Datastream & IPstream responses
- Zip file loaded with the responses gathered from the Datastream and IPstream consultations. These are briefings C21-BB-010 and C21-BB-011
(190 KB)- 15/11/2006
- LLU Closure
- Briefing C21-BB-009, LLU consultation closure document to be discussed at the Consult21 BB/LLU Working Group on 5 September 06
(209 KB)- 01/09/2006